Container-Native AI Capacity in Under 110 Days
Factory-built, modular AI compute units that drop on a prepared pad and produce revenue before a traditional build finishes permitting.
Outcomes that buyers in data center investors care about
- Stand up income-producing AI capacity in under 110 days
- Cut water use by tens of thousands of gallons per unit
- Reduce 10-year TCO by 30.2%
- Scale by adding modules rather than building greenfield
What is pushing the decision
The modules that carry the load in data center investors
Sovereign Network Isolation Layer
Hardware Zero Trust microsegmentation; NSA CSfC Certificate 4969 lineage.
OSI L2 / L4
Sovereign Thermal Management Unit
Direct immersion cooling; eliminates CRAC; 44.5% lower electricity draw.
OSI L1
Application Risk Intelligence Engine
Attack surface discovery; software bill of materials; vulnerability baseline.
OSI L5 / L7
Integrated Risk Management Platform
GRC automation for FISMA, CMMC, HIPAA, NIST 800-53; $151K per year per install savings.
OSI L7
Hardware Telemetry Engine
Neuromorphic edge processing; hardware anomaly detection at the silicon.
OSI L1
Smart Money Presentation
Investor-focused briefing on Edge Realm's market position, ERVault economics, deployment pipeline, and capital plan. Updated 2026-05-14.
PDF. Investor briefing format. Best for capital allocators evaluating Edge Realm and the modular AI data center thesis.
Want the full Data Center Investors write-up?
The ERVault for Data Center Investors white paper covers deployment timeline, compliance mapping, and ROI summary in 12 to 18 pages. Available in the Resources library.
Download the Data Center Investors white paper Or schedule a 30 minute call